SABAG AG develops an integrated energy system for its Rothenburg site
SABAG AG has commissioned the development of an intelligent energy system at its Rothenburg location, marking a strategic step towards greater energy resilience and long‑term operational efficiency. The project is being delivered in collaboration with WWZ AG and NRG Solutions AG and includes the installation of a megawatt‑scale battery storage system as the core asset.
The rollout is structured in phases to ensure stable integration with existing operations. The first phase focuses on SDL marketing, enabling the site to provide grid‑stabilising services. This establishes the control framework and communication pathways required for later expansion. The second phase introduces on‑site photovoltaic generation and charging infrastructure for electric vehicles. Once complete, the system will be configured for self‑consumption optimisation, allowing SABAG AG to use more of its own renewable energy and reduce exposure to grid volatility.
The installation brings together energy storage, grid services and renewable generation in a single coordinated system. By combining these elements, SABAG AG is building a flexible energy platform that supports operational continuity, reduces long‑term energy costs and contributes to regional grid stability.
Ready to take action?
Read more about our modular C&I and grid-scale BESS.
Please contact your Brunstock representative for technical information specific to your part of the world.
#BESS #EnergyStorage #P250963



