by Brunstock | Jun 21, 2026 | Australia, BESS, ProjectAU, Renewables, Step-up stations, Switchgear
In February 2026 our three 5 MWh BESS blocks and two step-up skid stations arrived on site in Naracoorte, South Australia. It was a stunning day and the installation all went according to plan. This 15 MWh battery energy storage system (BESS) at Flow Power’s...
by Brunstock | Jun 19, 2026 | Australia, BESS, Brunstock
Brunstock Australia Pty Ltd’s Integrated Management System (IMS) Policy BR-IMS-POL-001 IMS Policy Rev B 2026-07-07 Our Quality Policy At Brunstock Australia (BRAU), we provide superior-quality energy storage solutions that not only comply with industry standards,...
by Brunstock | Jun 19, 2026 | Australia, BESS, Brunstock, Commercial and industrial, ProjectAU, Renewables, Step-up stations, Switchgear, Transformers
Our contribution to the Coonawarra BESS project included three of our 5 MWh energy storage units and a step-up transformer station with PCS. The equipment is all installed and ready to support the solar power generation on the site. BRUN-BESS-5MWh-0.5C is a versatile,...
by Brunstock | Jun 10, 2026 | Australia, Defence, ProjectAU, Transformers
Meeting the power demands of a critical government defence project requires more than good equipment. It requires rigorous quality assurance, proven manufacturing capability and the confidence that comes from seeing it tested in person. Brunstock recently completed...
by Brunstock | May 21, 2026 | BESS, Commercial and industrial
If you’ve spent any time around energy infrastructure conversations lately, you’ve probably heard the acronym. ‘C&I BESS’ thrown around—often alongside talk of rising electricity costs, demand charges, and grid reliability. But what does it...